Flat Roofing

James Paget Hospital Canteen Roof

James Paget Hospital Service Ducts

Wayland Academy

lpswich High School - The Girl's Day School Trust

The school as founded in 1878 and moved into Woolveston Hall during 1992. Within the parkland is the single storey building that houses the Junior Department. Faber Roofing using Langley materials as specified by Stephen Greenhalgh, Surveyor for The Girl's Day School Trust replaced the failing roof in 2002.

Glenwood Court

The flat roof to the main buildings and to the tank room were re-roofed using the "Bauder Total Roof System" which provides a 20 year warranty. Workmanship was to a very high standard consistent with the Company's long established reputation.

The Contract was awarded by North British Housing Association

Reliance Garage - Norwich

Faber Roofing were the successful Contractor for the installation of Kingspan Composite Cladding to roof and wall areas, including all supporting steelwork structures and drainage works as part of a major refurbishment of the Renault Showroom for the Holden Motor Group.

Cottage Residence

The roof to the Kitchen and Utility areas of this delightful cottage had a failing chipboard deck. The solution recommended and proposed by Faber was to provide an insulated composite plywood deck with a High Performance Bauderflex felt system.

The result has provided the owners with peace and mind in the knowledge that flat roofs do work when installed by a quality contractor.

Private Residence

The chipboard deck to the double garage and balcony areas of this striking property had failed due to water ingress. Invited to submit proposals to provide a long term solution (In excess of 20 years).

Faber recommended 18mm plywood decking to BS5268 PT2 with a High Performance modified felt system.

The contract was duly completed in a competitive market, and won on the strength of a reputation for "Quality" established over a 30 year period.

Former Rectory

This former rectory had asphalt waterproofing to both front entrance porch, and garage areas which had reached the end of its serviceable life.

Having invited Faber to carry out its "FREE" survey and condition report service, the owner proceeded with preparation and overlay proposals, which included careful consideration of detailing items, always essential to ensure a successful long term solution.